Szczecin 3×200 mm HDPE
Szczecin 3×200 mm HDPE
Location: Szczecin
Length: 1082 m
Barrier: Odra
Pipeline: HDPE 3 x 200 mm
Drilling rig: Normag NRI 300 TE
Completion: July 2016
Other projects:
Łazy Małe 1016×22.5 mm steel
Łazy Małe 1016×22.5 mm steel
Location: Łazy Małe (Milicz county)
Length: 530 m
Obstacle: Forest / Road / Green area
Pipeline: steel 1016×22.5 mm
Drilling rig: Normag NRI 300 TE
Completion: May/June 2016
Other projects:
Warsaw 323 × 8.8 mm/508 × 12.5 mm steel
Warszawa 323×8,8 mm/508×12,5 mm stal
Location: Warsaw
Length: 1070/435 m
Obstacle: S79 Road/Rail/Airport areas
Pipeline: steel 323×8.8 mm/ steel 508×12.5 mm
Drilling rig: Normag NRI 300 TE/ Prime Drilling PD 60/33RP
Execution: March/April 2016
Other projects:
Bogusławice 508 × 12.5 mm steel
Bogusławice 508 × 12.5 mm steel
Location: Bogusławice
Length: 616 m
Obstacle: Bogusławice Swamp
Pipeline: steel 508 × 12.5 mm
Drilling rig: Normag NRI 300 TE/ Prime Drilling PD 60/33RP
Realization: February 2016
Other projects:
Gdańsk 2 x 4 200/310 mm Flexx Brugg
Gdańsk 2 x 4 200/310 mm Flexx Brugg
Location: Gdańsk
Length: 2 x 217 m
Barrier: Mołtawa River
Pipeline: 2 x 4 200/310 mm Flexx Brugg
Drilling rig: Prime Drilling 60/33 RP
Completion: September/October 2015
Other projects:
Szczecin 200mm+250mm; 3x200mm+160mm; 315mm PE
Szczecin 200mm+250mm; 3x200mm+160mm; 315mm PE
Location: Szczecin
Length: 3×310 m
Barrier: Regalica river
Pipeline: 200mm PE + 250mm PE; 3x200mm PE + 160mm PE; 315mm PE
Drilling rig: Prime Drilling 60/33 RP
Execution: March 2015
Other projects:
Bytom 800 mm HDPE
Bytom 800 mm HDPE
Location: Bytom
Length: 390 m
Obstacle: Tracks
Pipeline: HDPE 800 mm
Drilling rig: Prime Drilling 60/33 RP
Execution: January 2015
Other projects:
Wólka Mlądzka, Otwock DN500 steel
Wólka Mlądzka, Otwock DN500 steel
Location: Wólka Mlądzka, Otwock
Length: 350 m
Barrier: Świder river
Pipeline: steel DN 500
Drilling rig: Prime Drilling PD60/33RP
Completion: December 2014
Other projects:
Świnoujście 200mm HDPE
Świnoujście 200mm HDPE
Location: Świnoujście
Length: 2×500 m
Barrier: Świna River
Pipeline: 200 mm HDPE
Drilling rig: Ditch Witch JT 40/20
Completion: June/July 2013
Other projects:
Borkowo DN500 steel
Borkowo DN500 steel
Location: Borkowo (Nowy Dwór County)
Length: 500 m
Barrier: River Wkra
Pipeline: steel DN 500
Rig: Prime Drilling PD60/33RP
Completion: September 2014